Educational

Educational

Hospitality building. Bacchus Marsh Grammar school.

Project under construction stage.
 
Lo56 at Drake BRV, Educational Facilities

Current project. TekNova Consult is involved in mechanical, electrical, hydraulic and fire services.Design of “mixed mode” systems for class rooms, computer room and board rooms. Featuring passive ventilation systems with supplementary reverse cycle air conditioning for use during summer and winter peaks.

 
Bacchus Marsh Grammar School

TekNova Consult undertook the detailed design for mechanical, electrical, communication, public address, hydraulic, fire and security services for this project. The documentation covers air conditioning to all areas, including toilet, kitchen ventilation. The electrical services including lighting, communications, security and power were carefully designed to meet the client requirements.
 
Hampton Park Secondary College

TekNova Consult took audit reports on the existing conditions. Design for new switchboard, review Exit and Emergency lighting layout for building complience with current regulations.
 
Deakin University, Toorak Campus, Building G

New academic offices and lecture theatre refurbishment, computer centres. Site surveys, lighting and power design. Communication network, backbone systems is used ranging from fibre - optics to CAT6 systems. Mechanical, fire and hydraulic services. Writing specification, report and project estimation.